Jorge Filipigh
Capabilities

Problems I work on

Each area starts with the engineering problem, then how I approach it and where the experience comes from. Employer work is described only in general terms.

01

Mechanical design and product development

Problem
A part has to meet customer requirements, fit its neighbors, survive its loads, and be made at volume, usually all at once and on a schedule.
How I work
I start from the interfaces and the manufacturing route, and I keep the supplier involved from concept through prototype builds and PPAP.
Evidence
Automotive programs from concept to PPAP at Continental, Harman, XDIN, and Marquardt (2011–2022). Elevator components and assemblies (2005–2008, 2023–present). Mechanism design with kinematic simulation in CATIA.
02

Injection-molded plastic parts

Problem
Molded parts fail in ways a drawing doesn't show: sink, warp, short shots, weak knit lines, cracked bosses, and tolerances the tool can't hold.
How I work
I review supplier DFM and Moldflow reports, change the geometry before the tool is cut, and negotiate tolerances and special characteristics against what the process can actually hold.
Evidence
Electronic housings (Continental), audio components (Harman), interior trim and complex plastic parts (XDIN), switch enclosures and key fobs (Marquardt). First tooling work on vandal-resistant elevator push buttons with Braille (Ascensores Volta).
03

Brackets, supports, and sheet-metal structures

Problem
Brackets are small parts with big consequences. They set the load path, the stiffness, and the fastener loads, and they are often where cost hides.
How I work
I trace the load path, check stiffness and stresses, and design to what the stamping or fabrication process can produce, with the supplier aligned on tolerances.
Evidence
Stamped brackets and support brackets for OEM audio speakers (Harman). FEA of brackets, sheet-metal assemblies, hydraulic components, and structural supports for elevators (Otis). Steel platforms and equipment structures in my independent HVAC design work.
04

Finite element analysis

Problem
A colorful stress plot can hide a wrong boundary condition. The value of FEA is in the setup and the interpretation.
How I work
I state the question first, then choose the idealization, materials, contacts, and restraints that answer it, and I report what the model can't tell us. I also support other engineers in setting up and interpreting their simulations.
Evidence
ANSYS: structural simulation in my current role, speaker-enclosure simulation for automotive audio at Harman, and early-career work in Buenos Aires. FEA in Siemens NX (Marquardt) and CATIA (XDIN). SolidWorks Simulation for independent work.
05

GD&T and tolerance analysis

Problem
Tolerances are design decisions. If they don't reflect function, either the part costs too much or the assembly doesn't work.
How I work
I choose datums from how the part is located and assembled, control features according to what they have to do, and run stack-ups on the dimensions that matter. I read dimensional reports to close the loop with manufacturing and inspection.
Evidence
GD&T drawings for parts and assemblies (XDIN, Marquardt). Stack-up analysis and dimensional-report reviews (Otis). PCB outlines, keep-outs, and PCB-to-housing clash analysis (Continental, Marquardt). Formal GD&T and tolerance-stack training (2011).
06

HVAC, refrigeration, and controlled environments

Problem
Thermal equipment has to hold a condition (temperature, humidity, airflow) inside a real room, with real loads and a real installation.
How I work
I calculate thermal loads, size valves, ducts, and piping by load and pressure drop, and integrate the controls and the structure that carries the equipment.
Evidence
HVAC design at Frimax (2009–2011): thermal loads, TXV selection, duct and pipe sizing, PLC controls. Independent design work since 2016: stability and process chambers, pre-cooling chambers, and cold rooms, including an airflow study checked against anemometer measurements. See work →
07

Electronics integration

Problem
A housing that ignores the board, the connectors, and the assembly sequence will be redesigned late.
How I work
I bring the PCB into the CAD early, check clearances and connector access, and design ribs and supports around the board.
Evidence
PCB-to-housing integration for body electronics (Continental) and switches and key fobs (Marquardt). Electromechanical technician background and hobby electronics. See lab →